On February 24, Vale announced officially that it had
canceled the emergency status of Itabiruçu tailings dam after comprehensive
analysis about the geological characteristics of the mine. Now Itabiruçu status
complies with the safety rule of the law.
During the one-year investigation, they finished the analysis about
infrastructure, geology, construction methods, and so on. The analysis can
reflect the accurate status of the mine.
The evaluation of the analysis was conducted by the external institution of the
Public Prosecutor's Office of Minas Gerais (MPMG) and verificated by National
Mining Agency (ANM).